Environment
Runtime environment and core technical requirements.
\n \n \n \n
Skip to contentA clear view of what is already validated, the gate currently in progress and the stages that come next. This page reflects the latest checkpoint saved in the project documentation.
The classic two-row toolbar is implemented. The next step is responsive visual polish, especially a controlled mobile composition.
These stages are marked PASS in the current Proof of Concept roadmap.
Runtime environment and core technical requirements.
Application bootstrap and service kernel.
Structured configuration, environments and secret separation.
Data layer and versioned schema migrations.
Preflight, controlled installation and install lock.
Authentication, session and access-control foundations.
Administration shell and the base visual system.
Content model and editorial states.
Page administration interface.
Drafts, publishing and concurrent-edit protection.
Reusable components and visual rules inside Control.
Mobile navigation and the Rich Editor baseline.
LIVE 3.4 passed deployment and technical validation. The exact two-row desktop concept is achieved; the gate stays open until final visual acceptance.
The values below come from the checkpoint and version history for 0.1.0-poc.g6.7.4.3.4.
The current sequence keeps the core minimal and adds capabilities in validated layers.
Media integration remains deferred to the Media Engine.
The permanent direction is “Core minimal, capabilities modular”.
Content, pages, states, versions and editorial workflow.
Dedicated SEO control integrated into the editorial experience.
Themes, design tokens, global styles, components and brand identity.
Predictable, semantic server-side frontend rendering.
Catalog can exist without Commerce; Commerce depends on Catalog.
Audit → diagnostic → RED contract → design/fix → simulations → tests → verifications → final audit → build → regression → package audit → backup → deploy → live verify → visual test.
A gate is not marked Product / Visual PASS before user visual confirmation.
This page is updated from real project checkpoints.